Click here for Enquiries

You are here: Home > Mechanical Processing

 

Mechanical Processing

 

Assignments handled during the last five years

 

  • Technical / Engineering Survey of a non-woven plant

  • General facilities for manufacturing and testing of non-woven for a unit

  •  

  • Bankable weaving project

  • Viability study of weaving activity

  • Technical evaluation of a textile company

  • Technical appraisal of a modern weaving unit

  • Market survey to assess the demand of looms

  • Testing & performance examination of textile machinery

  • Benchmarking weaving section of a modern denim unit

  •  

  • Process audit for improving quality and productivity in spinning

  • Yarn quality audit in a spinning mill

  • Performance audit in a spinning mill

  • Technical certificate regarding process loss

  • Technical certificate regarding evaluation of products with respect to category

  • Technical certificate on process flow, production process and input-output ratio

  • Technical certificate issued on moisture content of cotton fibres

  • Lace braiding – an opinion

  • Bolting cloth – Technical information

  • Technical certification of embroidery machine

  • Certificate for material consumption of wrapper cloth

  • Cost estimation of Tussar fabric and jacquard sari border

  • Terry towel standards

  • Shrinkage norms for napkin preparatory

  •  

  • Yarn Inspection

  • Fabric inspection

  • Fabric inspection by four points system

  • Grey fabric inspection

  • Garment inspection

  •  

  • Cotton spinnability

  • Scope to improve yarn realisation

  • Causes for high yarn imperfections

  • Measures to reduce imperfections in a count

  • Optimisation of twist level in plied yarn to get lowest yarn elongation

  • Spinning machinery audit

  • Process and maintenance audit in winding section of a modern spinning mill

  •  

  • Improving efficiency in shuttleless type of looms [any make / model]

  • Improving efficiency in automatic type of looms [any make / model]

  • Breakage study for shuttleless Looms

  • Assessment of interference loss of weavers

  •  

  • Shop floor investigation for the performance improvement in the mills

  • Studies to improve loomshed productivity and fabric packing percentage

  • Shop-floor investigation for quality and productivity improvement in weaving

  •  

  • Maintenance audit in loomshed

  • Maintenance audit in weaving preparatory

  • Control of consumption of machinery spares in a modern weaving

  • Control of hard waste in a modern weaving

  • Stores audit report for a modern weaving unit

  • Problem of reed damage

  •  

  • Single end sizing

  • Low pick-up at sizing

  • Improving warping productivity

  • Causes for weft breakage and soft yarn and remedial measures to reduce the same

  • Diagnostic survey in weaving preparatory

  • Diagnostic study in yarn godown

  • Analysis of knitted fabric for contamination